Production Management

BOM planning

  • Multi-bill of materials (commercial, production, sub-contracting, etc.)
  • Current bills of material
  • Mass maintenance
  • Manage changes on a product and bill of materials
  • Version number management (major and minor version)

Shop floor control

  • Collection of labor time
  • Direct labor (setup and run)
  • Indirect labor (breaks and indirect time)
  • Actual and elapsed time
  • Multi-tasking (synchronized or unsynchronized)
  • Automatic breaks
  • Time and attendance (Clock in/out)
  • Indirect Time Entry (Clock in/out)
  • Break Time Entry (Clock in/out)
  • Team Entry
  • Shop Floor Tracking Workbench

Quality control

  • Batch and sub-batch number management
  • Serial number management
  • Use-by date management
  • Stock status management: accepted, rejected, inspected
  • Re-inspection date management
  • Stock sub-status management
  • Quality control record creation
  • Quality control procedures with analysis request
  • Expiry date management
  • Upstream and downstream traceability management

Project Management

  • Project Work and Product Breakdown Structure
  • Multi-level description of the tasks, preparing the operational and manufacturing process
  • Project Cost Breakdown Structure (CBS) Multilevel description of budgets, allowing the project cost follow-up
  • Employee assignments
  • Advanced project duplication function
  • Financial follow-up function to monitor the budget and expenses of projects
  • Time entries to enter the time spent on a project at the operation, task and budget level